Apply
For UK builders & trades

Construction Break-Even Calculation: The Turnover You Need

Sviat Jay
Sviat JayFounder of BizMentor & Craftex. Updated , 4 min read
Desk calculator on a dark surface

The short answer

Break-even turnover = fixed overheads (including your own wage) ÷ gross margin %. £8,000 a month of overheads at a 30% margin needs £26,667 of work a month.

  1. The formula: monthly overheads ÷ gross margin % = break-even turnover a month.
  2. Put your own wage in overheads. Leave it out and you'll 'break even' while working for nothing.
  3. Gross margin moves break-even most. At 20% margin the same business needs 50% more turnover than at 30%.
  4. Margin of safety: keep your normal month at least 20% above break-even, and recheck it every quarter.

Ask most builders what turnover they need each month just to cover their costs and they'll guess. Some guess high and panic about every quiet week. Most guess low, take on work that doesn't cover the overheads, and wonder why a busy year left nothing in the bank.

Your break-even is one number, and the construction break even calculation takes ten minutes. Here's how, with a worked example and what to do with the answer. If you'd rather work it out on your real numbers with us, book a free strategy call.

1Step 1 of 4

The break-even formula

Break-even turnover = fixed overheads ÷ gross margin %

Two numbers go in:

  • Fixed overheads: everything you pay whether or not you're on a job this month, including your own wage.
  • Gross margin %: what's left of each £1 of turnover after the job's direct costs, divided by turnover. Direct costs are materials, labour on the job, subcontractors, skips and plant.

The gross margin is what each pound of work contributes towards your overheads. Break-even is the turnover where those contributions exactly cover them.

Free 1-on-1 call

Still not sure where your break-even is?

Book a free call with our team. We'll work out your break-even, your real margins and the turnover you need for the profit you want.

2Step 2 of 4

A worked example

An illustrative building company with these monthly overheads:

Overhead Per month
Owner's wage £4,000
Office or yard, phone, software £900
Vans and fuel (not charged to jobs) £1,300
Insurance, accountant, memberships £700
Admin support (part-time) £800
Marketing £300
Total fixed overheads £8,000

Now divide by the gross margin:

Gross margin Break-even turnover a month A year
35% £22,857 £274,286
30% £26,667 £320,000
25% £32,000 £384,000
20% £40,000 £480,000

Same business, same overheads. At 20% margin it needs £40,000 of work a month to stand still; at 30% it needs £26,667. That's why gross margin moves your break-even more than anything else. See what profit margins UK builders should aim for.

Two calculators close up
Ten minutes with last year's accounts and your bank statements is enough to get a real number.
Mistake to avoid

Leaving your own wage out of overheads. You'll hit "break-even" while working for free, and the business will look healthier than it is.

3Step 3 of 4

Your break-even day rate

If you're still on the tools, turn it into a day rate. Days you can actually bill are fewer than you think:

Line Days a year
Weekdays in a year 260
Less holidays and bank holidays −36
Less quoting, admin, weather, sick days −34
Billable days 190

Illustrative sole trader: £12,000 a year of overheads (van, insurance, phone, tools, accountant) plus the £36,000 wage he wants = £48,000. Divided by 190 days = £253 a day before materials and before any profit. If he's charging £220 a day, he's losing money on every job and doesn't know it.

Not sure your prices cover your break-even? Book a free strategy call and we'll work it out on your real numbers.

4Step 4 of 4

What to do with the number

Compare your normal month with break-even. The gap above it is your margin of safety.

Your normal month vs break-even What it means What to do
Below break-even Every month loses money, however busy Raise prices or cut overheads before you take more work
0–20% above One bad job or a quiet month puts you under Fix margin on the next quotes; build a cash reserve
20–50% above Healthy, with room for a bad month Grow carefully; check before adding fixed costs
50%+ above Strong; you can afford to invest Add people or marketing, re-check break-even after each addition

Three levers move break-even. In order of impact:

  • Gross margin. Price from your own costs, to a target margin, not a markup. A 25% markup is only a 20% margin. Our pricing guide shows how.
  • Overheads. Every new van, hire or office raises the turnover you need. Before you add one, work out the extra turnover it needs: £600 a month at 25% margin needs £2,400 a month of extra work.
  • Mix of work. Jobs that earn a better margin lower break-even without any extra turnover.

If you're already busy and still short, read busy but no profit next.

Before you hire, work out the new break-even. A £3,000-a-month hire at a 25% margin needs £12,000 a month of extra work just to pay for itself.

Free 1-on-1 call

Leave with a plan for your next 90 days

A few short questions about your business, then 45 minutes, free, 1-on-1 with our team. Your next 90 days, even if we’re not a fit.

Check it with the other numbers

Break-even is one of the numbers that tell you whether a construction business is healthy. Our 12 KPIs for UK builders covers the rest: gross and net margin, overheads, win rate, pipeline, cash reserve and debtors. To score your business against all six areas in 4 minutes, take the free Construction Business Scorecard.

Ghennadi, a decorator from Northampton, went from £2K to £13.5K a month profit in 60 days, largely by pricing jobs properly and presenting quotes live. Individual results, not typical or guaranteed.

Open-plan office with rows of desks and frosted partitions

Break-even checklist

In 1-to-1 mentoring with Sviat, who runs Craftex today, these numbers are the starting point. We find where your margin leaks and build on what you're already good at. We aim for results in about 4 months rather than a 1–3-year program. On the tools and under £500K a year? Watch our free training first.

Checklist

This quarter

  • Monthly overheads listed, including your own wage
  • Real gross margin worked out from finished jobs
  • Break-even turnover and day rate calculated
  • Normal month compared with break-even
  • New break-even worked out before any new hire, van or office
FAQ

Frequently asked questions

How do you calculate break-even for a construction business?

Add up your fixed overheads for a month, including your own wage, vans, insurance, office, software and any staff not charged to jobs. Divide by your gross margin as a decimal. With £8,000 of overheads and a 30% gross margin, break-even is £8,000 ÷ 0.30 = £26,667 of turnover a month.

What counts as overheads for a builder?

Costs you pay whether or not you're on a job: vans and fuel not charged to jobs, insurance, accountant, software, phone, office or yard, marketing, admin staff, and your own wage. Direct costs that belong to a job, such as materials, labour on that job, subcontractors, skips and plant hire, are not overheads; they come off turnover before gross margin.

What is a break-even day rate?

The amount each working day must bring in to cover your costs and wage before profit. Add your annual overheads and the wage you want, then divide by the days you'll realistically bill: after holidays, bank holidays, weather, quoting and admin days, many trades bill far fewer days than they think.

Why am I busy but not making money?

Usually because your gross margin is lower than you think, so your break-even is higher than your turnover. Work out your real gross margin from finished jobs, then your break-even. If turnover sits at or below it, more work at the same margin won't fix it; prices or costs have to change.

Free strategy call

Know your numbers, then grow

Book a free strategy call. We'll work out your break-even, your real margins and the turnover you need for the profit you want.

Takes 2 minutes to apply.