How Much Does Bid Writing Cost in the UK?

The short answer
Most UK bid writers charge about £300–£750 a day (median around £500), or roughly £500–£5,000+ per tender, depending on its size.
- Day rates: about £300–£500 for juniors and freelancers, £500–£750 for senior sector specialists.
- Per tender: £500–£2,500 small, £2,500–£5,000 standard SME public tender, £5,000+ for a large framework.
- Judge the fee against margin, not contract value, using the payback test below.
- A ready bid library is the biggest way to cut the cost of every bid.
How much does bid writing cost in the UK, and is it worth it for a contractor? The fee is only half the answer.
Whether a bid writer is expensive depends on two things. One is the margin on the contract. The other is how much a better bid moves your chance of winning. This guide shows how fees work and gives you a payback test for your own numbers. If you'd like us to run it with you, book a free strategy call.
What bid writers charge in 2026
There's no regulated price list, but several sources publish figures you can check:
| Measure | Published UK figure | Source |
|---|---|---|
| Median contract day rate, bid writer | £500 / day | IT Jobs Watch, 6 months to 7 Oct 2026 |
| Junior / independent freelancer | £300–£500 / day | Consultancy fee guide, 2026/27 |
| Senior sector specialist | £500–£750 / day | Consultancy fee guide, 2026/27 |
| Small or simple tender | £500–£2,500 | Consultancy fee guide, 2026/27 |
| Standard SME public tender | £2,500–£5,000 | Consultancy fee guide, 2026/27 |
| Large framework / major contract | £5,000+ | Consultancy fee guide, 2026/27 |
Treat these as a sense-check, not a quote. Figures are usually plus VAT. An in-house bid writer is a salary plus on-costs, whether you're bidding or not.
Not sure which tenders are worth paying a bid writer for?
Book a free call with our team. We'll run the payback test on your next tender and tell you if it's worth bidding.
What UK bid consultancies publish on their own sites
Many bid writers won't put a price online. Some UK consultancies do, so you can benchmark any quote you get (checked October 2026):

| Consultancy | Published figure |
|---|---|
| Glaxtons | Bid review from about £950; single tender response £2,000–£8,000; framework application from about £10,000 |
| The Hudson Collective | Starting rate £600 + VAT per day; writing baseline of about £1,500 + VAT in their worked example of a smaller submission |
| Tsaks Consulting | Average tender it assists with around £4,000 + VAT |
| Thornton & Lowe | Outsourced or freelance bid writers typically £450–£750 per day |
Read together, a pattern appears. A straightforward construction tender with a handful of quality questions lands around £1,500–£4,000. A framework with method statements, social value and case studies across several lots goes well past £5,000.
Freelancer, agency or in-house: the cheapest option depends on volume
| Option | Typical cost | Best when |
|---|---|---|
| Freelance bid writer | £300–£750 per day | You bid occasionally and already have a decent bid library |
| Bid consultancy / agency | £1,500–£8,000+ per tender | A large or framework tender where strategy, review and project management matter |
| In-house bid writer | £20,000–£55,000 salary (Careerpilot), plus employer costs | You submit a steady flow of tenders every month |
Here's the rule of thumb we use with contractors. If you submit fewer than one or two substantial tenders a month, paying per bid is almost always cheaper than a salary.
Once tendering becomes your main route to work, the maths changes. A part-time or in-house bid coordinator, with an external reviewer on the big ones, usually wins on cost.
The four fee models (and what to watch in each)
- Day rate. You pay for time. Ask for an estimate of days and a cap up front, or a tight deadline can quietly double the bill.
- Fixed fee per tender. One price for an agreed scope: questions, word count, reviews. Pricing schedules, social value plans, presentations and clarifications are often extra.
- Retainer. A monthly fee for a set amount of bid support. It only makes sense if you bid regularly. Otherwise you pay for capacity you don't use.
- Lower fee + win fee. A reduced upfront fee plus a success fee on award. It shares the risk. Check the trigger: award, contract signature or first payment? And on a framework, award doesn't guarantee any work.
Leave with a plan for your next 90 days
A few short questions about your business, then 45 minutes, free, 1-on-1 with our team. Your next 90 days, even if we’re not a fit.
What makes a construction bid cost more
- Number and length of quality questions. A 6-question subcontract package is a different job from a 20-question framework with method statements per lot.
- Missing evidence. With no written case studies, CVs or project photos, the writer must interview you and build them first.
- Pre-qualification gaps. If the tender asks for an accreditation you don't hold, no writer can score it. Check this before paying anyone. Our guide to CHAS vs Constructionline vs SafeContractor explains the schemes.
- Social value. Central government contracts under the Procurement Act 2023 must weight social value at least 10% of the total score. That's PPN 002, for procurements started from 1 October 2025. Many other public buyers follow suit.
- Deadline. A tender handed over with five days to go costs more and usually scores worse.
The payback test: when a bid is worth paying for
Most owners judge a bid fee against the contract value. That's the wrong number. Judge it against the gross margin you'd keep, and how much a better bid really improves your odds.

Here's the formula:
Expected gain = contract value × your gross margin × (chance of winning with help − chance without)
Illustrative example, not a promise of results: a £400,000 contract at 15% gross margin is worth £60,000 of margin. Say a stronger bid moves your chance of winning from 15% to 25%. The expected gain is £60,000 × 10% = £6,000. A £3,000 bid fee pays back on paper; a £7,000 one doesn't.
Three rules stop you wasting money:
- Bid/no-bid first. If you can't meet the pass/fail questions, the turnover threshold or the start date, no writer will fix it. Walk away early.
- Be honest about the "without" chance. If you've never scored well on quality, your baseline is lower than you think. Then help is worth more.
- Count the cost of losing. A lost tender also costs your own estimating and management time. Our guide on how to win construction tenders in the UK has the bid/no-bid checklist.
Want a second opinion on whether your next tender passes the test? Book a free strategy call and bring the numbers.
How to cut the cost of every bid
Contractors who pay least per bid have a bid library ready before the tender lands:
- Signed, current policies: health and safety, quality, environmental, equality, modern slavery.
- Accreditation certificates (see CHAS vs Constructionline vs SafeContractor), insurance schedules and the last two years' accounts.
- Three to five case studies: scope, value, programme, problems solved, photos and a client who'll take a reference call.
- One-page CVs for the people who will actually run the job.
- Sample RAMS, a quality plan and your subcontractor vetting process.
- A social value record with numbers: local labour, apprentices, suppliers, community work.
Build it once and update it after every job. Every bid after that needs fewer paid days.
How to choose a bid writer for construction
- Construction experience. Ask for anonymised method statements and quality answers written for contractors, not just for services or care.
- Tender strategy, not just writing. A good writer pushes back on bids you shouldn't enter. They read the scoring criteria before writing a word.
- Clear scope in writing. Deliverables, rounds of review, who uploads the submission and what costs extra.
- Feedback loop. Ask how they use the buyer's feedback after a loss to improve the next bid.
This guide is general information, not financial or legal advice. Fee figures are published third-party market ranges checked in October 2026 and will change. Always get a written quote.
Sources: IT Jobs Watch (Bid Writer contract rates, UK) and the Tsaks Consulting 2026/27 fee guide. Social value: GOV.UK PPN 002.


