Apply
For painting & decorating businesses

How to Price Decorating Jobs: A Guide for UK Decorators

Sviat Jay
Sviat JayFounder of BizMentor & Craftex. Updated , 7 min read
Operative preparing an old panelled door

The short answer

Price a decorating job from the hours each stage takes (protection and prep, coats, snagging), costed at your true hourly rate, plus paint, sundries and travel, then divide by (1 − your margin floor). Use room and m² rates to check the price, never to make it.

  1. A room rate is not a price. At a £450 bedroom price, our example job must be finished in 7.5 hours to keep a 30% margin.
  2. Hours × true hourly cost. Not the wage: with NI, pension and holiday, a decorator on £18 costs about £27.40 an hour.
  3. Prep is its own line. It is where the hours hide, so the client must see it on the quote.
  4. Commercial is priced by m² and terms. CIS, retention and 30-day payment change the price, not just the rate.

Most decorators price the way they learned on the tools: "about £200 a day" or "£450 for a bedroom", because that is what everyone charges. Then the walls need twice the filling you expected. The client picks a darker colour after the first coat. The job runs into a third day you never charged for.

This guide shows how to price decorating jobs so every quote makes money. It is for owners of UK painting and decorating businesses who want to stop selling their own days. Want your rates checked against a real job? Book a free strategy call.

For setting your margin floor and budgeting the year, see our decorating profit margin guide. This page is about pricing the job in front of you.

Why a room rate or day rate loses money

Homeowner cost guides are a useful market check. MyBuilder's 2026 guide puts a decorator at about £150–£250 a day. It prices a medium room such as a bedroom at about £450 and a large living room at about £1,000, paint included. But "a bedroom" means very different work:

  • A clean repaint, same colour: light prep, two coats, empty room
  • A dark-to-light colour change: an extra coat, sometimes two
  • Cracked walls and old woodwork: hours of filling, sanding and caulking
  • A lived-in room: moving furniture, dust sheets, working around the family
  • A pre-1960s house: paint that may contain lead, so slower, safer methods

Quote them all at one rate and you win the easy rooms and lose money on the hard ones. A day rate has a second problem: it caps you at your own labour. You cannot grow a team on a rate that only pays one person.

1Step 1 of 5

Know your numbers before you price anything

You need two numbers from your own books:

  1. True hourly cost. Wages plus employer NI, pension, holiday, van, tools, access kit and insurance, divided by the hours you can charge. For a decorator on £18 an hour, our playbook works it out at £27.40.
  2. Margin floor. Your overheads as a % of turnover plus the net profit you want. With 20% overheads and 10% profit, nothing goes out below a 30% gross margin.

Every price on this page is cost ÷ (1 − margin floor). At 30%, that is cost ÷ 0.7. The margin guide shows how to work out both numbers.

Now your day rate. Eight chargeable hours at £27.40 is £219. At a 30% floor it must sell for about £313 a day, before paint. That is above the £150–£250 the cost guides quote. The market rate pays a sole trader for his own labour. It does not pay for a team, a van and an office.

Paint tins, rollers and trays laid out on a kitchen worktop
Paint is the small part of the cost. The hours decide the price.
2Step 2 of 5

Price every stage, and prep as its own line

Never price a job from a photo. On the visit, check the surfaces, the colours now and the colours wanted, ceiling heights, access and how old the paint is. Then price the hours stage by stage:

  • protection: moving furniture, dust sheets, masking
  • preparation: filling, sanding, caulking, stain block, stripping paper
  • coats: mist coat, undercoat and top coats on each surface
  • snagging and clean-up
From Sviat

On decorating, labour is most of the cost. Preparation is where the hours hide — price it as its own line.

Show "preparation" on the quote with what it includes. When the walls are worse than described, you have a line to point to, not an argument.

Mistake to avoid

Quoting a period door and windows at your normal rate, then finding lead paint on day one. Test suspect surfaces at the survey. Wet methods and clean-up take longer, so price them in.

3Step 3 of 5

A worked example: one double bedroom

Double bedroom, lived-in house (example figures). Walls and ceiling, two coats. Skirting, door and frame, undercoat and gloss. Light filling.

Stage Hours Cost £
Protection and preparation 4 109.60
Coats: ceiling, walls, woodwork 9 246.60
Snagging and clean-up 1 27.40
Labour at £27.40/h 14 383.60

Then add what is not labour:

Painter using a roller on an interior wall
Count the coats and the prep hours, not just the rooms.
£90paint and sundries at cost: emulsion, gloss, filler, caulk, tape
£20travel and parking
42 m²walls and ceiling to paint

Direct cost: £493.60. At a 30% floor the price is £493.60 ÷ 0.7 = £705. Add VAT if you are registered. That is about £16.80 per m², inside the £8–£25 range in the cost guide.

Now the check. At the £450 "bedroom price", your cost can be no more than £315 to keep your floor. Take off £110 for paint and travel and you have £205 of labour. That is 7.5 hours. If your team cannot do the room to your standard in a day, £450 is a loss.

Cover of UK Painting & Decorating Profitability Playbook
Free guide, 14 pages

UK Painting & Decorating Profitability Playbook

Work out your true hourly cost and margin floor, then job-cost every interior, exterior and commercial job.

Get the free guide
4Step 4 of 5

Day rate, room rate, m² or fixed price

Use each method where it fits, and build all of them from the same hourly cost:

Method Use it for How to set it
Fixed price per jobHomeowners, whole rooms, whole housesStage hours × cost + paint and travel, ÷ (1 − floor)
Room rateA quick first figure on the phoneYour own past jobs, job-costed, never the cost guide
Price per m²Commercial, new-build, large areasYour production rate per m² × cost, plus access and prep
Day rateDayworks, unknown scope, labour for a builder8 h × £27.40 = £219, ÷ 0.7 = about £313 minimum

A room rate is only as good as your records. Job-cost your last ten bedrooms: hours by stage, paint used, price. That gives you a real rate for the phone, and it shows which jobs to stop chasing.

Free 1-on-1 call

Not sure your hourly cost and margin floor are right?

Book a free strategy call and we will check them with you.

5Step 5 of 5

Commercial and exterior jobs

Commercial decorating is priced differently. Here is how to quote commercial decorating without losing the margin in the terms:

  • Measure from the drawings. Walls, ceilings, doors and frames by type, in m² or numbers.
  • Use your own production rates. How many m² a decorator really does per hour on this surface, from your job-costing.
  • Add the extras as lines. Access towers or scaffold, protection, out-of-hours work, snagging after other trades.
  • Price the terms. Painting for a contractor falls under CIS. Expect 20% off your labour (30% if not registered) unless you hold gross payment status. The VAT reverse charge may apply, and retention is often held.

Exteriors depend on the weather. Add a realistic allowance for lost days, and keep exterior and interior jobs costed apart. If you are close to £90,000 of taxable turnover in 12 months, you must register for VAT, so price with it in mind.

For a four-minute score of your pricing, cash, sales and systems, take the free Construction Business Scorecard.

Workers on scaffolding repairing and painting a building facade
Access, weather and payment terms belong in the price, not the margin.

Write a quote that protects your margin

A quote is not a number on a WhatsApp message. Put in writing:

  • Scope. Rooms, surfaces and coats, and the colours agreed
  • Preparation. What it includes, and what happens if the surfaces are worse
  • Exclusions. Plaster repairs, moving heavy furniture, damage by other trades
  • Payment. Deposit for materials, stages or completion, and the date due
  • Changes. Colour changes after the first coat and extra rooms are priced extras

When the client asks for more, use one line every time: "No problem, we can do that. It's outside the original quote. I'll send you a price today, and we'll start once you've approved it in writing." See how to get paid for variations.

Decorators painting the outside of a house from a stepladder
A clear scope turns "while you're here" into a priced extra.
Real result

Ghennadi, decorator: £2K a month to £13.5K a month profit in 60 days

Read the case

He started pricing every job properly with a clear scope of works and moved from £34K to £50K projects. Individual results, not typical or guaranteed.

Sviat Jay runs a working construction company, Craftex, and mentors owners one to one himself. Every decorating business is different: one owner is strong on finish, another on sales. Working one to one, he builds on what you are already good at.

He is aiming for results in about 4 months rather than 1–3-year programs. Ready to grow past your own labour? See how to grow a decorating business, or book a free strategy call.

Free 1-on-1 call

Want your decorating prices built from your own numbers?

Book a free strategy call.

Before you send your next decorating quote

Tax and safety points are general information as of October 2026. Check the details with your accountant and current HSE guidance.

Checklist

Before you go

  • You surveyed the surfaces, colours, access and age of the paint
  • Hours are estimated stage by stage, prep as its own line
  • Labour is costed at your true hourly cost, not the wage
  • Paint and travel are in at cost, and the price is cost ÷ (1 − floor)
  • Scope, exclusions, payment and colour-change terms are in writing
FAQ

Frequently asked questions

How do you price a decorating job?

Survey the job and estimate the hours for each stage: protection and preparation, coats, and snagging. Multiply by your true hourly cost, add paint, sundries and travel at cost, then divide by (1 − your margin floor). Check the result against room or m² rates, but do not start from them.

How much should a painter and decorator charge per day in the UK?

Your minimum is your own cost. In our example, 8 hours at £27.40 is £219, which at a 30% margin floor must sell for about £313 before paint. MyBuilder's 2026 guide puts the market at around £150–£250 a day, which is why a firm with staff should price by the job, not the day.

How much does a decorator charge per room?

MyBuilder's 2026 guide gives about £350 for a small room, £450 for a medium room such as a bedroom and £1,000 for a large living room, paint included. Work out how many hours that pays for at your own cost before you accept it.

How do you quote commercial decorating work?

Measure the areas from drawings, price by m² from your own production rates, then add access, protection, out-of-hours working and snagging. Build CIS deductions, retention and 30-day payment terms into your cash plan before you submit the price.

Should decorators mark up paint?

Price the whole job, labour and materials together, at cost ÷ (1 − margin floor). Then every part of the job carries your margin. A separate 20% markup on paint earns only 16.7% margin on it.

Free strategy call

Price every decorating job at a margin worth getting up for

Book a free strategy call. We look at your rates, your last three jobs and your clients, and what to fix first.

Takes 2 minutes to apply.