Apply
For tradespeople starting a construction business

How to Start a Construction Company in the UK: 10 Steps

Sviat Jay
Sviat JayFounder of BizMentor & Craftex. Updated , 9 min read
Rooftop view down into a courtyard of brick buildings

The short answer

Register, insure and price properly in your first week. Then spend every spare hour finding clients: they, not the paperwork, decide whether your new construction company succeeds.

  1. Set up in a week: niche, sole trader or Ltd (£100 online), CIS, insurance and a business bank account.
  2. HMRC from day one: CIS if you pay or are paid by contractors, VAT past £90,000, PAYE when you employ.
  3. Price for profit: overheads, your own time and a real margin in every quote, even the first one.
  4. Clients decide success. Your first months are calls, site visits and follow-ups, not logos.

Starting a construction company is the step that turns a good tradesperson into a business owner. The paperwork takes a few days. The hard part is everything after it: pricing for profit, finding clients and building a team.

This guide shows you how to start a construction company in the UK, step by step. It covers your niche, HMRC, insurance, pricing and your first clients, with a 2026 set-up checklist at the top.

It's written by Sviat Jay. He started in London as a demolition labourer, worked as a carpenter and built his own construction company, Craftex. Want a plan for your own start? Book a free strategy call.

Checklist to start a construction company in the UK (2026)

The legal and tax side in one table. Figures from GOV.UK, checked October 2026.

Aerial view of a London street with brick buildings
What When you need it Cost / key figure
Sole trader registration (HMRC Self Assessment)Before your first tax year ends, if you trade as yourselfFree
Limited company (Companies House)If you want limited liability and to look like a company to bigger clients£100 online, usually within 24 hours
CIS registrationIf you pay subcontractors (as contractor) or are paid by contractors (as subcontractor)Subcontractors: 20% deducted if registered, 30% if not
VAT registrationWhen taxable turnover passes the threshold in any rolling 12 months£90,000 threshold
PAYEBefore you pay your first employeeFree to register
Employers' liability insuranceAs soon as you employ anyoneLegal minimum £5M cover
Public liability insuranceBefore any work on a client's propertyClients and main contractors ask for it
Business bank accountFrom day oneKeeps tax and profit visible

Starting with almost no savings? Read how to start a construction company with no money. Still employed? Run the checklist before leaving your job to start a building business. Not sure between sole trader and Ltd? See how to structure a construction company.

Step 1: Research the market and choose your niche

Before you register a single thing, work out where you fit in the market. Construction covers a wide range of work. Trying to do everything from the start is one of the most common mistakes new owners make.

Your niche might be:

  • Residential: extensions, loft conversions, new builds or refurbishments
  • Commercial fit-outs: offices, retail units and restaurants
  • Specialist trades: roofing, groundwork, electrical, plumbing or plastering
  • Maintenance and repairs for property managers and letting agents

Look at local competitors: what projects they win, how they price and where there are gaps in quality or availability. If firms in your area are overbooked or under-delivering, that's your opening.

From Sviat

When I turned Craftex into a General Contractor, I went from smaller jobs to a £1.3M office fit-out within 2 months. Add 10 packages to what you do, speak to the same contacts, and you can 10x your job value.

Step 2: Write a simple construction business plan

A business plan isn't just a document for the bank. It forces you to think through your services, clients, start-up costs, pricing and numbers before money is on the line. Keep it to a few pages:

  • What you do and for whom, and what makes you different
  • Demand in your area and who you compete with
  • Services and pricing, with the margin you need on each job
  • Start-up costs: tools, vehicle, insurance, registration, working capital
  • How you'll win work in the first 90 days
  • Monthly numbers: turnover target, costs and profit

Many tradespeople buy a van and start working without a plan, then wonder why the business feels chaotic six months later. A clear plan makes every decision easier. For the sales side, use the construction company marketing plan.

Step 3: Choose the right business structure

How you set up legally affects tax, liability and how bigger clients see you.

New-build house with timber cladding and glazing
Structure Good for Watch out for
Sole traderTesting the water, small jobs, the simplest paperworkYou are personally liable for business debts
Limited companyGrowing, bigger clients, main contractor workAnnual accounts, Corporation Tax, director duties
PartnershipTwo or more people starting togetherNo limited liability unless it's an LLP; agree roles in writing

For most people serious about building a real construction company, a limited company is the right move. It protects your personal assets, looks more credible to bigger clients and makes it easier to get on approved supplier lists.

Free 1-on-1 call

Starting out and not sure what to do first?

Book a free call. Sviat still runs Craftex and will map your first 90 days with you.

Step 4: Register your business and set up for tax

For a limited company, register with Companies House: choose a name (check the domain is free too), appoint directors and file the incorporation documents. Online registration costs £100. HMRC then sets you up for Corporation Tax. Sole traders register for Self Assessment with HMRC, which is free.

Then the schemes that matter in construction:

  • Construction Industry Scheme (CIS). As a contractor you verify subcontractors with HMRC, deduct the right rate and file monthly returns. As a subcontractor, registering means 20% is deducted from your labour instead of 30%, until you qualify for gross payment status.
  • VAT. You must register once taxable turnover passes £90,000 in any rolling 12 months. Some firms register earlier on purpose, for example when most clients are VAT-registered businesses. Missed it? See what to do if you went over the VAT threshold by accident.
  • PAYE. Needed before you pay your first employee.

Get these right from the start and you avoid HMRC penalties and nasty cash surprises.

Step 5: Get the right insurance in place

Operating without the right cover puts your business, your team and your clients at risk. The main policies:

  • Public liability: injury or damage to third parties or their property during your work. Every client and main contractor will ask for it.
  • Employers' liability: a legal requirement as soon as you employ anyone, with at least £5 million cover.
  • Professional indemnity: claims from design or advice, important for design-and-build work.
  • Contract works / contractors' all-risk: the works in progress, plant and materials on site.

Use a broker who works with construction firms and compare quotes every year.

Step 6: Understand health and safety duties

Every construction business must follow UK health and safety law, whatever its size. The Construction (Design and Management) Regulations 2015 (CDM) set out the duties of everyone on a project.

When you're the only contractor, you plan, manage and monitor your own work and produce a construction phase plan. Where there is more than one contractor, a principal contractor and principal designer must be appointed.

Some projects must be notified to the HSE. That applies if a job lasts more than 30 working days with more than 20 workers on site at once, or exceeds 500 person days.

Getting it wrong can mean enforcement notices, fines and prosecution. A clean safety record also helps when you start pricing commercial work.

Step 7: Sort your finances and working capital

Construction eats cash. Materials and wages go out before client payments come in, and late payment is common. Plan for:

  • Registration Free (sole trader) or £100 (Ltd)
  • Insurance Depends on your trade, turnover and staff, so get broker quotes early
  • Tools and vehicle Many trades start with what they already own
  • Working capital Enough to carry wages and materials until the first stage payments land

Take a deposit and stage payments on every job so client money funds the materials, not yours. More on how much deposit to take.

Open a separate business bank account from day one. Mixing personal and business money is one of the fastest ways to lose track of profit and get caught out at tax time.

Step 8: Build your brand and online presence

Clients check you out before they call. At a minimum you need:

  • A clear company name and simple logo
  • A website with your services, real project photos and contact details
  • A Google Business Profile so local clients can find you
  • A LinkedIn profile, and Instagram if your work is very visual

Don't let this become busy-work. A decent website matters, but it won't bring clients by itself. More in construction website design.

Step 9: Price your work correctly

Wrong pricing is one of the main reasons construction businesses fail or stay stuck on low-margin, stressful work. Many new owners undercut to win jobs and lose money from the start.

Every quote should cover:

  • Direct costs Materials, labour (including your own time at a commercial rate), plant hire and subcontractors
  • Overheads Insurance, vehicles, fuel, tools, admin and office
  • Profit A real margin above break-even, not a token percentage

Read the scope, the site conditions, the programme and the payment terms before you price. Start with how to price building work and why quoting cheap is killing your business.

Step 10: Win your first clients

Getting the first clients is the hurdle most new construction businesses struggle with. What works:

  • Call your existing network. Former employers, colleagues, subcontractors, suppliers, friends. Call, don't text, and make hundreds of calls, not ten.
  • Walk onto live sites near you, ask for the project manager and offer a few people on day rate or one package to get in.
  • Small and mid-size developers always need reliable builders. Offer to price a deal before they buy.
  • Bigger contractors subcontract packages all the time. Here's how to get subcontract work from main contractors.
  • Ask every happy client for a review and a referral the day you finish.
Aerial view over Belgravia towards the palace gardens
From Sviat

Don't underestimate anyone in your phone. Friends, other builders, even family can bring you a deal.

In Sviat's view, MyBuilder and Checkatrade don't work for serious contractors, because you compete on price with several trades for small jobs. If you've registered but the phone isn't ringing, follow the 30-day plan for a new company with no work.

Real result

Oleg, 19: from £100 a day on site to £7K a month profit

Read the case

He started his own company, went out and found his own projects, and built a team of 10+ people within two months. Individual results, not typical or guaranteed.

Free 1-on-1 call

Want your first clients lined up before the van is paid off?

Book a free strategy call and we'll build your plan to win work.

How to grow beyond the basics

Getting started is one thing. Building a construction business that makes real money and doesn't need you on site every day is another.

The firms that grow share a few things:

  • Clear positioning that attracts better clients and bigger jobs.
  • Simple systems for quoting, project management and weekly numbers.
  • More than one source of work, so one quiet client never empties the diary.
  • Margins checked job by job, not once a year.

That's what Sviat works on one-to-one with owners. He still runs Craftex and builds each owner's plan around what they're already strong at. The aim is results in about 4 months, not a 1–3-year program.

To see what that looks like for your company, book a free strategy call. See real results from UK builders, or check where your business stands with the free 4-minute Construction Business Scorecard.

Cover of 20+ Ways to Get Construction Projects in the UK
Free guide, 24 pages

20+ Ways to Get Construction Projects in the UK

Every route UK builders use to find better jobs: referrals, architects, planning data, tenders and more, with the steps for each. Free.

Get the free guide

Final thought

Learning how to start a construction company is the easy part. Building one that's profitable, steady and doesn't take over your life is the real goal.

Start with a clear plan, price every job properly, build your reputation one project at a time and spend time finding work from day one. If you want to shorten the learning curve with someone who has done it, look at the BizMentor programs or book a free strategy call.

Checklist

Your first 30 days as a company

  • Choose your niche and write a one-page plan
  • Register (sole trader or Ltd), then CIS, and VAT or PAYE when they apply
  • Get public liability, plus employers' liability before you hire
  • Open a business bank account and set a tax pot
  • Make your contact list and start calling
FAQ

Frequently asked questions

How much does it cost to start a construction business in the UK?

Registering is cheap: sole trader registration with HMRC is free and a limited company costs £100 online. The real costs are insurance, tools, a vehicle and working capital to carry the first jobs. Many trades start lean with tools they already own, and take deposits and stage payments so client money funds the materials.

Do I need a licence to start a construction company in the UK?

There is no single general construction licence in the UK, but some work has its own rules. Gas work needs Gas Safe registration, notifiable electrical work must meet Part P of the Building Regulations, and licensable asbestos work needs an HSE licence. Check the rules for your trade and the work you plan to take on.

What is the Construction Industry Scheme (CIS) and do I need to register?

CIS is HMRC's scheme for payments between contractors and subcontractors in construction. If you pay subcontractors you must register as a contractor, verify them and file monthly returns. If you are paid as a subcontractor, registering means 20% is deducted from your labour instead of 30%.

What is the best business structure for a construction company?

For most construction businesses that want to grow, a limited company is the best structure. It protects your personal assets, looks more credible to bigger clients and main contractors, and can be more tax-efficient as profit grows. Sole trader is fine for testing the water on small jobs.

How do I find my first construction clients?

Start with everyone in your phone who is connected to construction: former employers, colleagues, subcontractors, suppliers and past clients. Call them, then visit live sites near you and small developers. Price-led platforms where several trades compete for small jobs are a slow way to start.

How long does it take to start making money in construction?

Calling existing contacts can bring conversations within 1–2 weeks and first paid work soon after. Steady, profitable months usually take longer and depend on how much time you spend on finding work alongside doing it.

What insurance does a construction business need in the UK?

Public liability for any work on clients' property, employers' liability (legally required once you employ anyone, minimum £5 million cover), contract works or contractors' all-risk cover for the works and plant, and professional indemnity if you design or give advice. A broker who works with construction firms can quote all of them together.

Free strategy call

Start it properly, with someone who has done it

Book a free strategy call. We'll look at your trade, contacts and numbers and map your first 90 days as a company.

Takes 2 minutes to apply.