How Long Is a Builder Liable for Defects in the UK?

Sviat Jay
Sviat JayFounder of BizMentor & Craftex. Updated , 6 min read
Penthouse lounge with a curved sofa and full-height curtains

The short answer

Usually 6 years from when the work was finished under a normal contract, 12 years if the contract was signed as a deed, and up to 15 years on work that creates a home. The defects period in your contract (often 6 or 12 months) is only the window to come back and fix things. It doesn't end your liability.

  1. The defects period isn't the end. It's the time you can return to fix defects; liability carries on after it.
  2. 6, 12 or 15 years: 6 for a simple contract, 12 for a deed, 15 for new homes and conversions under the Defective Premises Act (30 for older claims).
  3. Respond in writing, inspect, then decide. Real defect, fix it. Wear and tear, misuse or someone else's work, say so with evidence.
  4. Your paperwork is your defence: scope, signed variations, photos and a handover sign-off settle most complaints.

A client rings 9 months after handover. There's a crack in the ceiling, the bathroom door sticks, and "you said you'd stand behind your work." Your defects period ended 3 months ago. Do you still have to go back?

Often, yes. The defects period in your contract is not the limit of your liability. This guide sets out how long a builder is liable for defects in the UK and what to do this week when a complaint lands. Then how to set up jobs so fewer come back.

Want help with a complaint on your desk now? Book a free strategy call.

This is general information from a contractor's experience, not legal advice. Time limits depend on your contract and the facts. For your situation, speak to a construction solicitor.

1Step 1 of 6

How long a builder is liable for defects: 6, 12 or 15 years

How long you can be sued for defective work in England and Wales depends on the type of contract and the type of work.

Dining area with a glass flower chandelier and polished plaster walls
Situation Time limit for a claim Usually counted from
Normal (simple) contract: quote and terms, email agreement, most JCT Minor Works jobs6 yearsWhen the breach happened, usually when the work was done
Contract signed as a deed12 yearsAs above
Negligence claim for hidden damage (no contract claim)6 years from damage, or 3 years from when it was discovered, with a 15-year long-stopWhen damage happened or was found
Work that creates a dwelling (new build, conversion, enlargement into a home), Defective Premises Act15 years for claims arising since 28 June 2022; 30 years for earlier onesWhen the dwelling was completed, or when later repair work was finished

Two things catch builders out:

  • Going back to fix it can restart the clock on that repair work under the Defective Premises Act. Fix it properly the first time you return.
  • A deed doubles your exposure. If a client or main contractor asks you to sign "as a deed", ask why, and price the extra risk.
2Step 2 of 6

Defects period vs liability: not the same thing

The defects period (JCT calls it the rectification period) is a set time after completion, often 6 or 12 months. In it, you must come back and put right defects you're told about. On commercial jobs it's also when the second half of your retention comes back.

Defects period Legal liability
Set by Your contract The law (time limits above)
Typical length 6 or 12 months 6, 12 or 15 years
What it gives you The right and duty to return and fix The client's right to claim the cost of putting it right
When it ends On a fixed date When the time limit runs out

The defects period is actually good for you. It gives you the chance to fix a problem at your cost price, instead of paying for another builder to fix it at theirs.

Apartment with glazed bathroom doors and timber floor
Every finish you hand over is something you may be asked about years later. Photograph it on the day.
Mistake to avoid

Telling a client "your 12 months are up, nothing I can do." If the defect is your poor work, they can still claim. Refusing to look turns a £300 callback into a £3,000 claim plus another firm's prices.

3Step 3 of 6

This week: how to handle a complaint months later

Don't argue on the phone. Get it into writing and onto a timeline.

  • Day 1 Reply in writing. Thank them, ask for photos, a description and when they first noticed it.
  • Days 2–5 Pull the job file. Quote, contract, variations, photos, handover sign-off, anything they signed.
  • Within 10 days Inspect. Take your own photos and notes.
  • After the visit Put your view in writing: your defect and a date to fix it, or not your defect and why.

Copy-and-adapt reply:

Subject: [Address], your message about [issue]

Dear [name],

Thank you for letting us know about [issue] at [address]. We completed the works on [date].

Please send photos and a short description, and tell us when you first noticed it. We'd like to inspect on [two dates]. After the visit we'll confirm in writing what we'll put right and when.

Kind regards, [Name, company, phone]

Free 1-on-1 call

Callbacks eating your profit?

Book a free call and we'll go through your handover and how you price and handle defects.

4Step 4 of 6

Check whether it is actually your defect

Most "defects" aren't. Sort them before you promise anything.

Dining room with upholstered chairs and turquoise polished plaster
What you find Usually What to do
Poor workmanship or wrong material (your scope)Your defectFix it, get a signed sign-off
Hairline cracks in new plaster as it dries outOften drying shrinkage, not poor workExplain in writing; offer one making-good visit if your terms include it
Damage from use, cleaning products or no maintenanceWear and tear or misuseExplain with photos, offer a paid repair
Another trade's work, or the client's own supplierNot your scopeSay so, show your scope and sign-off
A design problem from the architect or engineerUsually the designer's, unless you designed itShow the drawings you built to

On jobs for homeowners, the Consumer Rights Act says your service must be done with reasonable care and skill. What you said or wrote about the work is binding if they relied on it.

Where you fall short, the client's first remedy is that you redo it, within a reasonable time and without significant inconvenience. If that's not possible, it's a price reduction. Clients can't claim for normal wear and tear, problems they caused, or changing their mind.

From Sviat

Most callbacks trace back to systems, not people. Take the free 4-minute Construction Business Scorecard: 18 questions on your pipeline, sales, pricing, cash flow and systems, with your weakest area shown first.

5Step 5 of 6

If the client won't pay because of "defects"

A client can fairly hold back a sum that reflects a real defect. They can't hold back £8,000 for a £200 snag.

  • Ask for the list in writing, with photos.
  • Offer to inspect and fix real items on set dates.
  • Ask for the undisputed balance now. Separate the money nobody argues about.
  • On commercial jobs, use your payment application and the Construction Act notices. A client who wants to pay less must say so in a pay less notice.

More on this: client won't pay the final invoice and a customer threatening a bad review.

6Step 6 of 6

Protect every future job

You can't remove liability, but you can make most complaints easy to answer. Craftex works as a main contractor on London projects. Our Systems Blueprint sets out the client experience we teach.

That means the same format for every update and variation, a handover pack with certificates and guarantees, and a review request at every handover. To set this up in your business, book a free strategy call.

  • Written scope with what's included and what isn't.
  • Signed variations before the extra work starts. See construction variations.
  • Photos at every stage, especially anything that gets covered up: first fix, insulation, waterproofing.
  • Handover sign-off: walk the job, sign the snag list, sign it off when done. If the list keeps growing, see client snagging list never ending.
  • Handover pack: certificates, guarantees, product details, care and maintenance notes.
  • Defect log for every job: date reported, item, visit date, fixed date, signed.
  • Clear terms on the defects period, what counts as a defect and how to report it. Why we prefer our own contracts for private clients: JCT vs a bespoke contract.
  • Insurance: check your public liability and, if you design, professional indemnity cover for the years after the job.
Dining room with upholstered chairs and turquoise polished plaster
High-spec finishes are where complaints start. A signed handover with photos ends most of them.
Free 1-on-1 call

Want jobs that end at handover, not 9 months later?

Book a free strategy call.

Your defects checklist

This is general information from a contractor's experience, not legal advice. For your situation, speak to a construction solicitor.

Checklist

Before you go

  • Complaint answered in writing within a few days
  • Job file pulled: scope, variations, photos, sign-off
  • Inspection booked; your defect or not, put in writing
  • Real defects fixed once, properly, and signed off
  • Handover pack, photo record and defect log on every new job
FAQ

Frequently asked questions

How long is a builder liable for defects in the UK?

In England and Wales, usually 6 years from when the work was done under a normal contract and 12 years if the contract was signed as a deed. Work that creates a dwelling also falls under the Defective Premises Act, with 15 years for claims arising since 28 June 2022. This is general information, not legal advice.

What is a defects liability period?

A period in your contract, often 6 or 12 months after completion, in which you must come back and put right defects you're told about. On commercial work, the second half of the retention is usually released at its end. It doesn't end your legal liability for defective work.

My client is complaining about work months later. What should I do?

Reply in writing within a few days, ask for photos and a description, and book an inspection. If it's your defect, fix it and get it signed off. If it's wear and tear, misuse or another trade's work, explain why in writing with your photos and records. Don't ignore it: a complaint ignored becomes a claim.

Can a client refuse to pay because they say the work isn't done properly?

They can hold back a sum that reasonably reflects a real defect, but not the whole invoice for a small snag. Ask for the defects in writing, offer to inspect and fix, and ask for the undisputed balance now. On consumer jobs, the client's legal remedies are repair (repeat performance) or a price reduction.

How long do I have to guarantee my work?

There's no single legal guarantee period. What you owe is set by your contract plus the time limits for claims: usually 6 years, 12 for a deed, longer for work creating a dwelling. Any written guarantee you give (for example 12 months on workmanship) is on top of that, so word it carefully.