Apply
For electrical contractors

Electrical Business Profit Margins: 5 Steps to Keep More

Sviat Jay
Sviat JayFounder of BizMentor & Craftex. Updated , 6 min read
Finished white railway-arch warehouse with LED battens, Drake's warehouse conversion by Craftex

The short answer

Electricians lose margin in the hours around the install: testing, certificates, notification and changes after first fix. Put each one on the quote and track it on every job.

  1. Give each work type its own target. Rewires and consumer units, EICRs, EV/solar/batteries and commercial maintenance do not earn the same margin, so budget them separately.
  2. A point price is built from hours. Hours per point × your true hourly cost + materials per point, divided by (1 − your margin floor).
  3. Testing and paperwork are billable. In our example, 5 forgotten hours of testing and admin = £137 of cost and about £196 of price you never charged.
  4. Lock the layout at first fix. Moves by the kitchen fitter and late fittings are variations: price them before second fix.

An electrical business profit margin in the UK is lost in the hours around the install: testing, certificates and changes after first fix. This page shows electricians how to price them in. Want your point prices checked? Book a free strategy call.

Where an electrical business makes and loses money

An electrical firm runs several businesses under one van. A rewire, an EICR, a battery install and a commercial maintenance contract each have a different mix of labour, materials and paperwork.

Margin leaks in the gaps between them:

  • Testing and certification squeezed into "the last hour" and never priced
  • Layout changes after first fix, absorbed to keep the client happy
  • Faults found on test that were never in the quote
  • Compliance overheads (scheme membership, insurance, calibration) left out of the hourly cost
  • Lead platform fees never counted against the jobs they bring: see whether Checkatrade and MyBuilder are worth it
1Step 1 of 5

Budget each type of work with its own margin

Split last year's turnover into the four lines you sell. They are domestic rewires and consumer units, EICRs and landlord testing, EV chargers with solar PV and batteries, and commercial fit-out and maintenance.

For each line, write down turnover, direct cost and gross margin. You will usually find one line paying for the others.

If commercial is the line you want to grow, start with our guide to getting commercial electrical contracts.

Line What drives cost What to watch
Rewires & consumer units Labour, making good Hours drifting on first fix
EICRs & landlord testing Testing time, travel Remedials priced on site
EV, solar & batteries Equipment Margin on kit, VAT date
Commercial Labour, programme CIS, payment terms

Your overheads include NICEIC or NAPIT scheme fees, insurance, vans, software and your own salary. Divide them by turnover to get overheads %, add the net profit you want, and that is your margin floor. Our construction profit margins guide shows the method and a markup-to-margin table.

From Sviat

Show turnover without VAT. If you’re VAT-registered, the VAT you charge isn’t your money — keep it in a separate account so it never looks like profit.

Office fit-out delivered by Craftex
Office fit-out by Craftex: lighting, small power and data are priced as their own electrical package.
From Sviat

Which number is costing you most? Take the free 4-minute Construction Business Scorecard: 18 questions on your pipeline, sales, pricing, cash flow and systems, with your weakest area shown first. Need prices built for you? See our estimating service.

2Step 2 of 5

Price by points and circuits, built from your hours

A price per point is fine for presenting a quote. It is dangerous when it is a number you copied. For a full worked quote, call-out and day-rate maths and the materials markup table, see how to price electrical jobs.

Build it like this:

  1. From your job-costing, take your real hours per point (socket, light, switch) and per new circuit.
  2. Multiply by your true hourly cost — about £27.40 for an employee on £18 an hour once NI, pension and holiday are in.
  3. Add materials per point.
  4. Divide by (1 − your margin floor).

Worked example: consumer unit change plus a new socket circuit (example figures)

Item Hours £
First fix 10 274.00
Second fix 6 164.40
Testing & certification 4 109.60
Notification admin 1 27.40
Materials — 520.00
Direct cost 21 1,095.40
Price at 30% floor (÷ 0.70) 1,565

Price only the first and second fix and you quote about £1,369. The 5 missing hours cost you £137 — around £196 of price you never charged, on every job like it.

Free 1-on-1 call

Want your points, circuits and testing time priced from your own numbers?

Book a free call.

3Step 3 of 5

Put compliance on the quote as its own line

From Sviat

Testing, certificates and Part P notification take real time on every job. Price them as a line, not as a favour.

In England, Part P makes three kinds of domestic work notifiable:

  • installing a new circuit
  • replacing a consumer unit
  • adding to or altering circuits in a room with a bath or shower (the zone up to 2.25 m high around it)

A scheme-registered electrician self-certifies, and the compliance certificate goes to the occupier and building control within 30 days. A non-registered installer must notify building control before starting. Either way, it is time and money — so it is a line on the quote.

Landlord testing is recurring work. Private landlords must have the installation checked at least every five years. Price an EICR by circuits and access, not per property, and quote remedials separately with a written approval.

Cover of UK Electrical Profitability Playbook
Free guide, 14 pages

UK Electrical Profitability Playbook

Get the free guide
4Step 4 of 5

Lock the layout between first and second fix

The expensive changes on electrical jobs happen after the cables are in:

  • the client adds sockets, lights or a garden supply once you are on site
  • the kitchen fitter moves the layout after first fix
  • the client buys fittings late and the spec changes
  • faults found on test that were never in the quote

Get the layout signed off before first fix. Anything that changes after it is priced the same day and approved in writing before you touch it.

Budget hours by stage — first fix, second fix, testing and certification — show them to the lead electrician, and compare actual hours every week.

Mistake to avoid

Treating "faults found on test" as your problem. Put a line in the quote: faults outside the scope are reported, priced and approved before repair.

Finished gym with machines, bikes and timber floor, Banbury
Finished gym fit-out by Craftex. Late changes to equipment positions move power points, which makes them variations.
5Step 5 of 5

Job-cost every rewire and every board change

Compare quoted and actual numbers by job type (the full weekly routine is in our job costing guide for builders):

Job Type Price Quoted GP Actual GP
Example A Rewire £8,571 30% 19%
Example B Consumer unit £2,400 35% 38%

The rewire lost 11 points — usually first-fix hours or unpriced extras. The board change beat its target. That tells you where to raise prices and where to sell more.

Two VAT checks before you send:

  • Solar PV and batteries in homes are zero-rated until 31 March 2027 and 5% after. On a quote that might be installed after that date, say which rate applies.
  • Work for other contractors under CIS between VAT-registered firms falls under the domestic reverse charge, so the contractor accounts for the VAT.

If turnover is approaching £90,000 over a rolling 12 months, you must register for VAT, so check before you price a big job.

What this looks like in practice. Dima is an electrician in our mentorship; his story is on Sviat's Russian-language YouTube channel. He put pricing and job-costing in place and took on around 10 people within about four weeks. He was earning around £7–8K a month. Individual results, not typical or guaranteed.

To do the same with your pricing, book a free strategy call.

The UK Electrical Profitability Playbook guide cover

Get the free PDF guide

14 pages. Sent to your inbox in 2 minutes.

Free 1-on-1 call

Want to see which of your electrical work types actually makes money?

Book a free strategy call.

Before you send your next electrical quote

Regulatory and tax points are general information as of October 2026, for England. Check the details with your scheme provider and accountant.

Checklist

Before you go

  • First fix, second fix and testing hours are each costed at your true rate
  • Notification and certification are on the quote as a line
  • Layout is signed off before first fix; changes are priced in writing
  • Faults found on test are excluded unless approved
  • VAT rate is checked for solar, batteries and contractor work
FAQ

Frequently asked questions

What is a good profit margin for an electrical contractor?

Work it out from your own accounts rather than an industry average. Add your overheads as a % of turnover to the net profit you want: 20% + 10% means no electrical job should go out below a 30% gross margin, after you have paid yourself a salary.

How do I price electrical jobs?

Break the job into points and circuits, cost each from your own hours and materials, then add the time for testing, certification and notification as separate lines. Divide the total direct cost by (1 − your margin floor) to get the price.

Should electricians charge for certificates and testing?

Yes. Testing, the BS 7671 certificate and Part P notification take real time and, for notifiable work, a scheme fee. Show them as a line on the quote so the client sees what they pay for.

What electrical work is notifiable under Part P?

In England, installing a new circuit, replacing a consumer unit, and adding to or altering circuits in a room with a bath or shower. A scheme-registered electrician self-certifies; anyone else must notify building control before starting.

How do I work out my electrician day rate?

Cost a day from your true hourly rate (wages plus employer NI, pension and holiday, divided by chargeable hours), multiply by the hours you can charge, then divide by (1 − your margin floor). That is your minimum, before materials.

Free strategy call

Get paid for the testing, the paperwork and the changes

Book a free strategy call. We look at your point prices and one recent job, and show where the hours go unpaid.

Takes 2 minutes to apply.