How to Get Commercial Electrical Contracts in the UK

The short answer
Pick one route first (subcontract packages, testing and maintenance contracts, direct fit-outs or public sector), get the cards and paperwork that route's buyers check, then price from drawings and protect your cash with applications and notices.
- There are four doors, not one. Subcontract packages, planned testing and maintenance, direct fit-outs and public sector work. Each has different buyers and checks.
- Cards first. On most commercial sites every electrician needs an ECS card. A gold card needs NVQ Level 3, the AM2, 18th Edition and the ECS health and safety assessment.
- Testing and maintenance is the steadiest work. Offices and shops are normally inspected every 5 years, factories every 3. Get CHAS, SafeContractor or Constructionline only when a buyer asks.
- Commercial cash runs on paperwork. Applications for payment, pay less notices, retention, CIS and the VAT reverse charge decide what ends up in the bank.
Commercial work looks like the answer when domestic rewires dry up or margins get squeezed. Bigger jobs, repeat clients, fewer evenings spent quoting kitchens.
But it is not one market. Think of a fit-out package for a main contractor, a maintenance contract for offices and a tender for a school. They are three different sales jobs, with three buyers checking three different things. Most electrical firms that "try commercial" and give up tried all of them at once.
This guide is for owners of UK electrical businesses, from 3-person firms to £1M+ contractors, who want their first or next commercial contracts. If you want help choosing your route into commercial electrical contracts, book a free strategy call.
The four ways into commercial electrical work
Commercial jobs are won on paper before anyone sees your workmanship. That means drawings priced properly, RAMS that match the job, cards that pass the gate, and a programme you can resource.

| Route | Who buys | Typical job | What wins it |
|---|---|---|---|
| Subcontract packages | Main contractors, fit-out and M&E contractors | Office, retail, restaurant or warehouse fit-out | Price to the drawings, labour you can actually supply, clean handover |
| Testing & maintenance | Facilities managers, managing agents, schools, care homes, multi-site retailers | EICRs, emergency lighting, fire alarm servicing, reactive call-outs | Reliability, reports on time, a fixed monthly price |
| Direct fit-outs | Business owners and landlords | Shop, salon, café or unit fit-out, lighting upgrades | Speed of response, a clear quote, design help |
| Public sector | Councils, housing associations, schools, NHS | Planned upgrades, testing programmes | Pre-qualification, frameworks, written tenders |
Pick one as your main route for the next 6–12 months. Subcontract packages and testing contracts are where most electrical firms start, because the buyers are local and you can meet them this month.
What commercial buyers check before you can price
Before a main contractor sends you drawings, they check you can work on their sites without risk to them. An FM company does the same before adding you to its supplier list.
- ECS cards for every electrician. ECS is the partner scheme to CSCS for electrical work, run by the JIB (SELECT in Scotland). A gold card needs NVQ Level 3, the AM2, current 18th Edition and the ECS health and safety assessment. Labourers and apprentices have their own cards.
- Competence scheme. NICEIC or NAPIT membership is what most commercial buyers look for as proof that your work is assessed.
- Health and safety paperwork. A written H&S policy, RAMS for the actual job, a safe-isolation procedure, training records and in-date test instrument calibration.
- Insurance. Public and employer's liability, and professional indemnity if you design. Read the PQQ: the level asked for varies by buyer, so check before you price.
- SSIP or Constructionline. Only when the buyer requires it: see the next point.
I made this mistake myself. At Craftex I paid a lot for accreditations, and on their own they never paid off. Get an accreditation only when a specific tender for a specific project asks for that specific accreditation. Most schemes take 2–3 months, so you will have time once the request is real.
Craftex holds CHAS, SafeContractor and three ISO accreditations today, but each was added when a client required it. If you are not sure which scheme a buyer wants, ask them before you pay for anything. See which accreditations you need for commercial work and CHAS costs and process.
Route 1: subcontract packages for main contractors
Main contractors and fit-out companies need an electrical package on almost every job. Many have the same problem. Some electricians price well and then cannot supply the labour. Others finish the install and disappear before the paperwork. Price packages from your own hours and margin floor: see how to price electrical jobs.
How to get on their list:
- List 20–30 main contractors and fit-out firms within an hour of your base. Look at site hoardings, local planning approvals and the firms already sending you domestic overflow.
- Find the estimator or commercial manager, not the director. Ask one question: "What do you need from an electrical subcontractor that you're not getting?"
- Send a one-page capability sheet: team size, ECS card levels, recent commercial jobs with photos, insurance and scheme details.
- Ask to price one small package. Your first job with a main contractor is an audition.
The full approach, with scripts, is in how to get subcontract work from main contractors.
What wins the second job is the handover. Test certificates, O&M information and as-installed drawings delivered on the day of completion, not three weeks later. That is what estimators remember.
Price from the drawings, not a rate per point you copied. Break the package into containment, distribution, small power, lighting, data and fire/emergency systems, then cost each from your own hours.
Worked example: office floor electrical package (example figures)
| Line | £ |
|---|---|
| Labour (first fix, second fix, testing) | 26,400 |
| Materials and containment | 17,300 |
| Testing, certification, O&M and as-installed drawings | 2,100 |
| Prelims (supervision, welfare share, waste, access kit) | 2,200 |
| Package price | 48,000 |
| Retention held at 5% | 2,400 |
On a monthly application cycle with 30-day payment terms, you may wait 6–8 weeks for the first money. Material and labour costs land in week one. Plan the cash before you sign: our Cash Flow & Margin Blueprint shows how.
Want your first commercial packages priced from your own hours and protected on cash?
Book a free call.
Route 2: testing and maintenance contracts
Testing work is the most predictable revenue an electrical firm can build. The schedule is set by guidance, not by whether a client feels like spending money this year.
| Work | Typical frequency | Who is responsible |
|---|---|---|
| Fixed wire testing (EICR), offices and shops | Every 5 years (IET Guidance Note 3) | The duty holder for the premises |
| EICR, factories and workshops | Every 3 years | The duty holder |
| EICR, cinemas and theatres | Every year | The duty holder |
| Emergency lighting | Monthly functional test + annual full-duration test (BS 5266-1) | The responsible person |
| Fire alarm | Weekly test by the site + professional servicing every 6 months (BS 5839-1) | The responsible person |
How to win it:
- Go where buildings are managed in bulk. Commercial managing agents, FM companies and multi-site operators (care homes, gyms, retail chains) control many sites. One relationship can feed a whole testing programme.
- Offer a records check. Ask to see the last EICR, the emergency lighting log and the fire alarm certificate. Most small landlords and business owners do not know when their next test is due. You are the person who tells them.
- Price it as a contract, not a visit. A fixed annual price per site, split monthly, with remedial work quoted separately and approved in writing.
- Report fast. Certificates and remedial quotes within days. FM buyers drop suppliers who make them chase paperwork.

Doing remedial work found on a test without written approval. On maintenance contracts the person who signs off spend is often not the person on site. Quote it, get a PO or email approval, then do it.
Route 3: direct fit-outs for business owners
Shops, salons, cafés, gyms and small warehouses need electrical work every time they open, move or refurbish. These clients often have no architect or M&E consultant, so they buy from whoever helps them understand what they need.
This is where an electrical firm can earn design time and better margins. Think lighting layouts, small power positions, kitchen and equipment supplies, EV charging for staff, three-phase upgrades. Price design and coordination as their own lines.
The fastest leads come from the trades around these jobs: shopfitters, flooring and ceiling contractors, commercial agents letting units, and landlords with empty units. Craftex's own fit-outs, such as the Drakes warehouse in central London, need an electrical package every time. That is how main contractors think: who can I trust with the next one?

Route 4: public sector work
Councils, housing associations, schools and NHS trusts buy electrical testing, upgrades and planned works. Smaller contracts are often advertised openly; larger programmes run through frameworks.
- Register free on Contracts Finder and Find a Tender and set alerts for electrical testing, rewiring and lighting.
- Expect a written pre-qualification: policies, insurance, accounts, references, case studies.
- Bigger programmes go through frameworks, which take months to get onto. See how to get on construction frameworks and how small builders win council contracts.
If writing tenders is the bottleneck, that is a solvable problem: our bid writing service is run by people who run a construction company.

Construction Project Leads Guide
Where to find projects before they reach tender, public and private.
Get the free guideGet paid on commercial work
Commercial electrical firms rarely fail for lack of work. They fail because cash goes out monthly and comes in late. Five things to set up before your first package:
- Applications for payment. Submit on the date in the subcontract, every time, with a valuation the QS can follow.
- Pay less notices. If the contractor wants to pay less than you applied for, they must serve a notice on time. Know the rules: received a pay less notice?
- Retention. Track every retention, its release date and who owes it. See retention money not released.
- CIS. Contractors deduct 20% from your labour if you are registered, 30% if not, unless you hold gross payment status.
- VAT reverse charge. Electrical installation for another VAT-registered contractor under CIS falls under the domestic reverse charge. The contractor accounts for the VAT, so it is not in your bank account.
If a contractor stops paying, act early: main contractor not paying a subcontractor.
Want to know if your firm is ready for commercial work, before you sign the first package?
Book a free strategy call.
Your first 90 days of commercial work
- Weeks 1–2: choose your route. Check every electrician's ECS card and update your RAMS, H&S policy and insurance schedule.
- Weeks 3–4: build your list of 20–30 main contractors, FM companies or managing agents. Write a one-page capability sheet with photos of real jobs.
- Weeks 5–8: call, meet, and ask to price one small package or test one building.
- Weeks 9–12: deliver it with paperwork on completion day, then ask for the next one and a reference.
More work means more people. Who to hire first, and why a second Qualified Supervisor matters, is in how to grow an electrical business.
At BizMentor, Sviat Jay works through this one-to-one with electrical business owners. He runs a working construction company, Craftex, that buys electrical packages. So he knows what main contractors look for, and why most subcontractors never get a second job.
Owners who don't need one-to-one start in a small group with regular one-to-one calls. The aim is results in about 4 months, not 1–3-year programs. To plan your first commercial contracts, book a free strategy call. To see where your business stands first, take the free 4-minute Construction Business Scorecard.
Standards, guidance and tax points are general information as of October 2026. Check details with your scheme provider, insurer and accountant.
Before you price your first commercial package
- Every electrician on the job has the right ECS card
- RAMS, H&S policy and insurance match what the buyer asked for
- Package priced from the drawings, line by line, from your own hours
- Testing, certificates, O&M and as-installed drawings priced and planned
- Application dates, retention and CIS status written down before you sign